Insulation Inspection will inspect the following code:
2021 IECC R105.2.2 Framing and rough-in inspection. Inspections at framing and rough-in shall be made before application of interior finish and shall verify compliance with the code as to: types of insulation and corresponding R-values and their correct location and proper installation; fenestration properties such as U-factor and SHGC and proper installation; air leakage controls as required by the code; and approved plans and specifications.