Foundation Inspection will inspect the following code:

2021 IBC [A] 110.3.1 Building Foundation Footings Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place prior to inspection. Materials for the foundation shall be on the job, except where concrete is ready mixed in accordance with ASTM C94, the concrete need not be on the job.

2021 IRC R109.1.1 Foundation inspection. Inspection of the foundation shall be made after poles or piers are set or trenches or basement areas are excavated and any required forms erected and any required reinforcing steel is in place and supported prior to the placing of concrete. The foundation inspection shall include excavations for thickened slabs intended for the support of bearing walls, partitions, structural supports, or equipment and special requirements for wood foundations. 2021 IEBC [A]109.3.1 Footing or foundation inspection. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place prior to inspection. Materials for the foundation shall be on the job, except where concrete is ready-mixed in accordance with ASTM C94, the concrete need not be on the job.

2021 IECC R105.2.1 Footing and foundation inspection. Inspections associated with footings and foundations shall verify compliance with the code as to Rvalue, location, thickness, depth of burial and protection of insulation as required by the code and approved plans and specifications.

2021 IECC C105.2.1 Footing and foundation insulation. Inspections shall verify the footing and foundation insulation R-value, location, thickness, depth of burial and protection of insulation as required by the code, approved plans and specifications.

2021 IRC R507 Deck Foundation Inspection will verify all deck foundation elements have been constructed in accordance with the adopted codes. Verify deck is supported on concrete footings or other approved structural system. 